C. ROKAS SA is also very experienced in the design and construction of industrial equipment in Greece and abroad, focusing mainly on the following categories:

Steel Mills

Gantry Cranes and Loading Cranes scrap

Overhead Traveling Cranes

Winches and Lifting Equipment of open type and big capacity

Power Stations

Gantry Cranes and Cranes for Large Hydro Power Plants

Gantry Cranes and Cranes of Thermo Power Stations

Other Industrial Lifting Equipment

Gantry cranes and Cranes

Maintenance cranes

Cranes of all types for Industrial Units

Among the projects that Rokas has constructed in the above sectors are:

Twenty-three cranes for Halyvourgiki

Cranes for the Elefsina Shipyards and other cranes for Industrial Units


Elefsina Shipyards

Maintenance Cranes (Rio-Antirrio) and other Gantry Cranes (Solinourgia Korinthou, Halyvourgiki, Halyvourgeia Thessalias), Loading Cranes scrap (Halyvourgiki).


Gantry Cranes (Solinourgia Korinthou)


Gantry Cranes (Solinourgia Korinthou)


Halyvourgiki (production management)

Two overhead travelling cranes, double girder, with rotating trolley, for the new rolling mill of Halyvourgiki (2006).


Halyvourgiki (New Rolling Mill)
Overhead travelling crane, 15 tons capacity & 27m. span.


Halyvourgiki (New Rolling Mill)
View of rotating trolley

Two overhead travelling cranes with anti-sway, drives' synchronization and anti-collision device systems, for the New Mesh Warehouse of Halyvourgiki (2006).


Halyvourgiki (New Mesh Warehouse)
Overhead travelling crane, 10 tons capacity & 62m. span.


Grab of 5.0 cubic metres capacity for the handling of laterite in the Raw Materials Warehouse


Overhead travelling crane – 16 tons capacity with grab, for the new Raw Materials Warehouse in LARCO G.M.M.S.A., Larymna


Halyvourgiki (New Mesh Warehouse)
View of special gripper during the transportation of structural steel mesh


Halyvourgiki (Scrap)

Among the projects that Rokas has constructed in this sector are:

Conveyor Belts.

Passenger Terminal Building of the new Athens International Airport

Hangars and Industrial Buildings

Automatic Loading System for Alumina for ALUMINIUM DE GRECE

Two thousand tons of combined steel structures for a cement factory in Damascus-Syria

Large number of electric overhead traveling cranes for countries such as SYRIA, JORDAN, CYPRUS, SAUDI ARABIA


Thessaly Smelting Facility

Bridges
In 2002, following an international tender, our company was assigned with the construction of five maintenance platforms for the Rio-Antirrio Bridge.


Rio-Antirrio

Each platform is installed under the bridge and in every bridge opening between the bridge towers. The platforms provide access to the undersurface of the bridge to the staff in charge of its maintenance. Despite their weight (40 tons), the platforms can move with great accuracy along the bridge with speed 30 m/min. Furthermore, as the platforms are permanent bridge constructions, they have been built with the most rigid antifouling standards as far as both their steel framework and their mechanical equipment is concerned. The project was completed successfully despite its complex technical features satisfied all entities that were in charge of the quality control of all Bridge constructions.
 

 



 
 